Why switching some parts to UK suppliers can save you money, and nerves, in 2025
In plain English: what’s happening?
Global shippers are dealing with three problems at once:
-
Higher import taxes (tariffs)
-
Anti-dumping penalties on certain Chinese products
-
Wild swings in container freight rates
Together, these make it hard to predict your true landed cost. One month you win, next month you lose—big.
Quick fix: Move even part of your spend from Asia to UK-made components. You slash duty bills, cut delivery risk and stop tying up cash in slow-moving stock.
1. Tariffs & freight – why the roller-coaster?

UK-made parts
Real-world pain: One CCTV-mount distributor saw freight on a single 40-ft box jump by $4,300 in a year. Planning became guesswork.
2. Why UK-made parts steady the ship
Bottom line: Our own on-time-in-full (OTIF) data shows the cost swing on a UK-origin bracket is 85 % smaller than the China route.
3. Cash-flow wins you can feel
-
Less cash locked in transit. A 35-day voyage means your money sits idle for five weeks.
-
Shorter lead time = lower safety stock. Cutting transit to under a week often halves the inventory you need on the shelf.
-
Cheaper finance. At a 7 % borrowing rate, every £100 k stuck on the water costs ~£700 extra per month.
4. What could still trip you up?
-
Red Sea attacks are keeping insurance rates high (ship traffic still down ~67 % vs 2022).
-
Panama Canal drought limits crossings, squeezing Pacific → US East Coast moves.
-
Asia–EU mainline sees more blank sailings than North-Atlantic lanes that serve UK ports.
Put it simply: Long Asian routes will stay unpredictable through 2025.
5. Three “no-regret” moves to start today
-
Dual-source key items. Shift 30 % of your critical SKUs to UK production; keep 70 % in Asia for cost balance.
-
Check rules-of-origin. Make sure your UK parts qualify for 0 % duty in the EU/US—paperwork is simple but essential.
-
Book UK freight eight weeks out. Lock in rates before peak season and avoid the last-minute premium.